
Odometer
127301.0

Condition
RUNS AND DRIVES

Certificate
SV

Has Keys
Yes
2015 MERCEDES-BENZ S 550 2015, VIN: WDDUG8CB5FA100502 - Auto history
Vehicle
VIN: WDDUG8CB5FA100502
Make
MERCEDES-BENZ
Model
S-CLASS
Year
2015
Model Variant
S 550
Series
S550
Vehicle Type
AUTOMOBILE
Color
BLACK
Transmission
AUTOMATIC
Fuel Type
GAS
Cylinders
8
Engine
4.6L 8
Drive
Rear-wheel drive
Plant Country
GERMANY
Plant City
SINDELFINGEN
Plant Company
Merceds-Benz Cars
Plant State
-
LOT INFORMATION
#81013553
Lot number
81013553
VIN
WDDUG8CB5FA100502
Location
GRAND PRAIRIE, TX
Retail value
26233
Estimated Repair Cost
19411
Auction
COPART
Condition
RUNS AND DRIVES
Sale Doc
SALVAGE VEHICLE TITLE
Primary Damage
SIDE
Secondary Damage
-
Odometer
127301
Has Keys
Yes
HIDE LOT
We do respect privacy rights of every person. Therefore if you do not want to show the lot you have purchased on our website, you can hide it.
1973 MERCEDES-BENZ S CLASS 1973 VIN: 11603212011481
1975 MERCEDES-BENZ S-CLASS 1975 VIN: 10704412024327
1978 MERCEDES-BENZ S 450 1978 VIN: 044860
1979 MERCEDES-BENZ 300 SD 1979 VIN: 11612012005360
Vin-based Vehicle Auction: WDDUG8CB5FA100502
2015 MERCEDES-BENZ S 550 2015 in BLACK at copart Auction
This 2015 2015 MERCEDES-BENZ S 550 with a 4.6L 8 engine in BLACK is up for auction at copart. It's listed under auction number and is scheduled for 2024-01-29 in the GRAND PRAIRIE, TX.
Key highlights of the auction , conducted at the GRAND PRAIRIE, TX branch, include:
- Vehicle sales history by vin: WDDUG8CB5FA100502
- Vehicle damage: SIDE
- Vehicle condition: RUNS AND DRIVES
- Vehicle mileage: 127301.0 mi / actual
- Vehicle document: SALVAGE VEHICLE TITLE
This page also provides detailed auction information, technical specifications of the vehicle, photographs, videos, and a 360-degree panoramic view. For similar copart auction listings of 2015 MERCEDES-BENZ S 550 vehicles, visit this link.