2014 MERCEDES-BENZ CLA 250 4MATIC 2014, VIN: WDDSJ4GB6EN102522 - Auto history
Vehicle
- Make
- MERCEDES-BENZ
- Model
- CLA-CLASS
- Year
- 2014
- Color
- RED
- Transmission
- AUTOMATIC
- Fuel Type
- GAS
- Engine
- 2.0L 4
- Drive
- All wheel drive
- Cylinders
- 4
- Body Style
- SEDAN 4D
Auction
- Auction
- COPART
- Sale date
- 2024-04-16
- Final offer
- 1750 USD
- Status
- Sold
LOT INFORMATION
- Lot number
- 43129604
- VIN
- WDDSJ4GB6EN102522
- Location
- ANCHORAGE, AK
- Seller
- -
- Primary Damage
- SIDE
- Secondary Damage
- -
- Estimated Repair Cost
- $8851
Vehicle Summary
This 2014 2014 MERCEDES-BENZ CLA 250 4MATIC with VIN WDDSJ4GB6EN102522 was sold at COPART in ANCHORAGE, AK on 2024-04-16. The final sale price was $1750 USD. The odometer shows 145,714 miles. Primary damage: SIDE, secondary damage: -.
Data sourced from COPART records. Over 5 million vehicles in our database from Copart and IAAI auctions across US, Canada, UK, and South Korea.
Frequently Asked Questions
What is the VIN for this 2014 2014 MERCEDES-BENZ CLA 250 4MATIC?
The Vehicle Identification Number (VIN) for this 2014 2014 MERCEDES-BENZ CLA 250 4MATIC is WDDSJ4GB6EN102522. This 17-character unique identifier can be used to track the vehicle's history, specifications, and auction records.
What damage does this 2014 2014 MERCEDES-BENZ CLA 250 4MATIC have?
This 2014 2014 MERCEDES-BENZ CLA 250 4MATIC (VIN: WDDSJ4GB6EN102522) has SIDE as primary damage and - as secondary damage. The vehicle condition is listed as RUNS AND DRIVES.
How much did this 2014 2014 MERCEDES-BENZ CLA 250 4MATIC sell for at auction?
This 2014 2014 MERCEDES-BENZ CLA 250 4MATIC (VIN: WDDSJ4GB6EN102522) sold for $1750 USD at COPART on 2024-04-16.
What is the mileage on this 2014 2014 MERCEDES-BENZ CLA 250 4MATIC?
This 2014 2014 MERCEDES-BENZ CLA 250 4MATIC (VIN: WDDSJ4GB6EN102522) has 145,714 miles on the odometer. This is important to consider when evaluating the vehicle's value and condition.
Where was this 2014 2014 MERCEDES-BENZ CLA 250 4MATIC sold?
This 2014 2014 MERCEDES-BENZ CLA 250 4MATIC (VIN: WDDSJ4GB6EN102522) was sold at COPART in ANCHORAGE, AK on 2024-04-16.
HIDE LOT
We do respect privacy rights of every person. Therefore if you do not want to show the lot you have purchased on our website, you can hide it.