2019 DODGE GRAND CARAVAN SXT 2019, VIN: 2C4RDGCG3KR783434 - Auto history

Image 1 of 2019 DODGE GRAND CARAVAN SXT 2019 with VIN 2C4RDGCG3KR783434
1 / 13

Vehicle

Make
DODGE
Model
CARAVAN
Year
2019
Color
BLACK
Transmission
AUTOMATIC
Fuel Type
FLEXIBLE FUEL
Engine
3.6L 6
Drive
Front-wheel Drive
Cylinders
6

Auction

Auction
COPART
Sale date
2024-03-15
Final offer
175 USD
Status
Sold

LOT INFORMATION

Lot number
39092664
VIN
2C4RDGCG3KR783434
Location
PENNSBURG, PA
Seller
-
Primary Damage
FRONT END
Secondary Damage
SIDE
Estimated Repair Cost
$13693

Vehicle Summary

This 2019 2019 DODGE GRAND CARAVAN SXT with VIN 2C4RDGCG3KR783434 was sold at COPART in PENNSBURG, PA on 2024-03-15. The final sale price was $175 USD. The odometer shows 120,444 miles. Primary damage: FRONT END, secondary damage: SIDE.

Data sourced from COPART records. Over 5 million vehicles in our database from Copart and IAAI auctions across US, Canada, UK, and South Korea.

Frequently Asked Questions

What is the VIN for this 2019 2019 DODGE GRAND CARAVAN SXT?

The Vehicle Identification Number (VIN) for this 2019 2019 DODGE GRAND CARAVAN SXT is 2C4RDGCG3KR783434. This 17-character unique identifier can be used to track the vehicle's history, specifications, and auction records.

What damage does this 2019 2019 DODGE GRAND CARAVAN SXT have?

This 2019 2019 DODGE GRAND CARAVAN SXT (VIN: 2C4RDGCG3KR783434) has FRONT END as primary damage and SIDE as secondary damage. The vehicle condition is listed as ENHANCED VEHICLES.

How much did this 2019 2019 DODGE GRAND CARAVAN SXT sell for at auction?

This 2019 2019 DODGE GRAND CARAVAN SXT (VIN: 2C4RDGCG3KR783434) sold for $175 USD at COPART on 2024-03-15.

What is the mileage on this 2019 2019 DODGE GRAND CARAVAN SXT?

This 2019 2019 DODGE GRAND CARAVAN SXT (VIN: 2C4RDGCG3KR783434) has 120,444 miles on the odometer. This is important to consider when evaluating the vehicle's value and condition.

Where was this 2019 2019 DODGE GRAND CARAVAN SXT sold?

This 2019 2019 DODGE GRAND CARAVAN SXT (VIN: 2C4RDGCG3KR783434) was sold at COPART in PENNSBURG, PA on 2024-03-15.

HIDE LOT

We do respect privacy rights of every person. Therefore if you do not want to show the lot you have purchased on our website, you can hide it.

No Image
COPART
Sale date
2024-07-16
VIN / LOT
2D4RN4DE4AR327596 / 61252444
Odometer
216549 mi / actual
Damage
FRONT END
Condition
RUNS AND DRIVES
No Image
COPART
Sale date
2024-07-05
VIN / LOT
2C4RDGBGXER298648 / 61033704
Odometer
102158 mi / actual
Damage
REAR END
Condition
ENHANCED VEHICLES
No Image
COPART
Sale date
2024-07-03
VIN / LOT
2C4RDGBG0ER241343 / 82533093
Odometer
0 mi / not actual
Damage
ALL OVER
Condition
-
No Image
COPART
Sale date
2024-07-03
VIN / LOT
1D8HN54P78B117097 / 54732774
Odometer
170027 mi / exempt
Damage
FRONT END
Condition
ENGINE START PROGRAM
You may also be interested in the following similar vehicles: