2020 ACURA TLX TECHNOLOGY 2020, VIN: 19UUB2F42LA002771 - Auto history

Vehicle

VIN: 19UUB2F42LA002771

Make

ACURA

Model

TLX

Year

2020

Model Variant

TECHNO

Series

-

Vehicle Type

AUTOMOBILE

Color

GRAY

Transmission

AUTOMATIC

Fuel Type

GAS

Cylinders

6

Engine

3.5L 6

Drive

Front-wheel Drive

Plant Country

UNITED STATES (USA)

Plant City

MARYSVILLE

Plant Company

-

Plant State

OHIO

Final offer 3400 USD
Sold

Lot Number:
46751304
Auction:
Copart
Status:
Sold
Date:
18/04/2024
Amount:
3400.0 USD

LOT INFORMATION

#46751304

Lot number

46751304


VIN

19UUB2F42LA002771


Location

WEST PALM BEACH, FL


Retail value

23576


Estimated Repair Cost

20762


Auction

COPART


Condition

RUNS AND DRIVES


Sale Doc

CERT OF TITLE SLVG REBUILDABLE


Primary Damage

REAR END


Secondary Damage

SIDE


Odometer

35827


Has Keys

Yes

HIDE LOT

We do respect privacy rights of every person. Therefore if you do not want to show the lot you have purchased on our website, you can hide it.

2008 ACURA TSX  2008 image
Copart
Sale date
2024-04-10
VIN / LOT
JH4CL96818C012995 / 74458763
Odometer
189152 mi / exempt
Damage
ALL OVER
Condition
RUNS AND DRIVES
Acura Tlx Tech 2015 image
Copart
Sale date
2023-11-13
VIN / LOT
19UUB1F5XFA011855 / 63640592
Odometer
91546 mi / not actual
Damage
Front End
Condition
ENGINE START PROGRAM
Acura Tlx 2015 image
Copart
Sale date
2023-11-14
VIN / LOT
19UUB1F31FA007370 / 72939843
Odometer
139816 mi / actual
Damage
Rear End
Condition
RUNS AND DRIVES
Acura Tlx 2015 image
Copart
Sale date
2023-11-21
VIN / LOT
19UUB1F3XFA025706 / 71758943
Odometer
200793 mi / actual
Damage
Front End
Condition
RUNS AND DRIVES

Vin-based Vehicle Auction: 19UUB2F42LA002771

2020 ACURA TLX TECHNOLOGY 2020 in GRAY at copart Auction

This 2020 2020 ACURA TLX TECHNOLOGY with a 3.5L 6 engine in GRAY is up for auction at copart. It's listed under auction number and is scheduled for 2024-04-18 in the WEST PALM BEACH, FL.

Key highlights of the auction , conducted at the WEST PALM BEACH, FL branch, include:

  • Vehicle sales history by vin: 19UUB2F42LA002771
  • Vehicle damage: REAR END
  • Vehicle condition: RUNS AND DRIVES
  • Vehicle mileage: 35827.0 mi / actual
  • Vehicle document: CERT OF TITLE SLVG REBUILDABLE

This page also provides detailed auction information, technical specifications of the vehicle, photographs, videos, and a 360-degree panoramic view. For similar copart auction listings of 2020 ACURA TLX TECHNOLOGY vehicles, visit this link.